News

NMDC Steel Limited Hits Milestone with 1 Million Ton Production of Hot Rolled Coil

Bhubaneswar: NMDC Steel Limited (NSL) has achieved a major production milestone by successfully producing 1 million tons (MnT) of Hot Rolled Coil (HRC) at its state-of-the-art facility, reaching this landmark four days ahead of the first anniversary of its HRC production. This accomplishment underscores NSL’s status as one of the fastest and most efficient steel plants in the industry, showcasing its advanced technology and operational excellence.

The achievement builds on NSL’s impressive track record in 2024. The company had previously reached significant production milestones with 1.5 MnT of Hot Metal from its Blast Furnace on July 21 and 1 MnT of Liquid Steel from the Steel Making Shop (SMS) on August 11. These records, attained in under a year from the start of production, set new industry benchmarks.

The ultra-modern plant, with an investment of Rs. 22,900 crore, is one of India’s largest, featuring one of the widest Hot Strip Mills in the country. The facility is capable of rolling HRCs ranging from 900 mm to 1650 mm in width and 1 mm to 16 mm in thickness.

Amitava Mukherjee, CMD (Additional Charge), NMDC & NSL, expressed pride in the achievement, stating, “Reaching the 1 MnT HRC production milestone ahead of schedule is a testament to the dedication and expertise of our team. This success sets a new standard in the PSU sector and reaffirms our commitment to leading the industry with quality and efficiency.”

NMDC Steel Limited, a prominent public sector enterprise under the Ministry of Steel, continues to drive advancements in manufacturing technology while focusing on excellence, sustainability, and innovation. With its remarkable speed and performance, NSL is dedicated to setting new industry standards and leading the steel manufacturing sector into the future.

Bureau The News Hashtag

Recent Posts

Odisha Opens Five Hirakud Gates, Begins Controlled Water Release from Reservoirs Ahead of Possible Cyclone

Bhubaneswar: The Odisha Government has initiated advance reservoir management measures across the State ahead of…

20 hours ago

Odisha Steps Up Urban Relief and Restoration After Cyclone Arnab; Extra Engineers Deployed in Brahmapur

Bhubaneswar: The Odisha Housing and Urban Development Department has intensified relief and restoration operations in…

21 hours ago

Telecom Services Restored in 99% of Ganjam Blocks After Cyclone Arnab

Bhubaneswar: Telecom connectivity has been restored in 99 per cent of blocks in Ganjam district…

21 hours ago

Severe Cyclonic Storm Murasu to Hit South Andhra Coast Between Monday Night and Tuesday Morning

Bhubaneswar: With Cyclonic Storm ‘Murasu’ gaining strength over the Bay of Bengal, the IMD has…

21 hours ago

Rabi Narayan Naik Reviews Cyclone Arnab Restoration, Stresses Drinking Water Supply and Road Connectivity

Bhubaneswar: Rural Development, Panchayati Raj and Drinking Water Minister Rabi Narayan Naik has directed officials…

21 hours ago

Water Resources Principal Secretary Reviews Drainage Systems in Ganjam After Cyclone Arnab

Bhubaneswar: Principal Secretary of the Water Resources Department Shubha Sarma continued her field-level assessment of…

21 hours ago