Odisha

Ministry of Railways Sanctions Flyover at Khurda Road to Ease Traffic Congestion

Bhubaneswar: To address the increasing train traffic and congestion at Khurda Road Station, the Ministry of Railways has sanctioned a significant infrastructure project. The East Coast Railway (ECoR) had earlier proposed the construction of a Flyover Bridge to facilitate smoother train operations on the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line. This project, to be executed under the Energy Corridor Scheme of Indian Railways, aims to enhance the efficiency and capacity of train movements in this busy section.

The flyover, estimated to cost ₹191.87 crores, is designed to provide a dedicated infrastructure for trains traveling from Puri to connect to the down line towards Bhubaneswar without crossing other lines at Khurda Road Station.

Key Highlights of the Project:

  • Project Cost: The flyover will be constructed at a sanctioned cost of ₹191.87 crores.
  • Length: The Flyover Bridge will span 7.41 km.
  • Hassle-Free Movement for Passenger Trains: This will facilitate smooth movement of passenger trains in the Bhubaneswar direction originating from Puri.
  • Energy Corridor Scheme: The construction will be part of the Energy Corridor of Indian Railways, showcasing a commitment to sustainable and efficient infrastructure development.
  • Operational Efficiency: The new flyover will eliminate detentions due to cross-movements, improving the average speed and operational efficiency of trains on both the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line.
  • Congestion Relief: Main line trains will no longer be detained at Khurda Road Station, significantly reducing the waiting period for trains approaching this busy junction.

Khurda Road Railway Station is a major junction, handling various train movements. The construction of this flyover will facilitate simultaneous movements of trains in the Bhubaneswar-Brahmapur and Khurda Road-Puri rail sections. Previously, train movements had to be halted at Khurda Road to allow for cross-traffic from the Puri direction, leading to delays and operational inefficiencies.

Currently, any train coming from Puri and heading towards Bhubaneswar creates a surface crossing at Khurda Road Junction Station. This limitation prevents the simultaneous movement of trains from Khurda towards Palasa and from Puri towards Bhubaneswar. Once this flyover is commissioned, simultaneous movement of trains from Puri and towards the south can occur together. As a result, passengers from Puri and the south towards Bhubaneswar, and from the Bhubaneswar direction towards the south, will not experience delays due to the passing of trains from triangular directions.

Bureau The News Hashtag

Recent Posts

Odisha Rolls Out Heritage Property Promotion Guidelines to Revive Historic Buildings Through Tourism

Bhubaneswar: Seeking to preserve Odisha’s fading architectural heritage while creating new economic opportunities, the state…

19 hours ago

Odisha Police Steps Up Vigil Ahead of NEET-UG 2026

Bhubaneswar: Odisha Police has put in place extensive security and surveillance measures ahead of the…

19 hours ago

‘Advika Barta’ Creates Platform for Adolescents to Engage Directly with Odisha Govt

Bhubaneswar: Creating a platform for young voices to be heard in governance and policymaking, Deputy…

19 hours ago

Summer Bird Nesting Doubles at Hirakud Wetland, Reflecting Conservation Gains

Bhubaneswar: Odisha’s Hirakud Wetland, a recognised Ramsar Site, has recorded a remarkable rise in summer…

19 hours ago

Odisha Gears Up for ‘Subhadra Shakti Samavesh’ to Boost Women’s Empowerment Across Villages

Bhubaneswar: Ahead of the statewide rollout of the ‘Subhadra Shakti Samavesh’ programme, Deputy Chief Minister…

19 hours ago

EMRS Mahasingi Qualifies for Zonal Round of National Youth Parliament Competition

Bhubaneswar: In a proud moment for Odisha’s tribal education ecosystem, Eklavya Model Residential School (EMRS),…

20 hours ago