Odisha

Ministry of Railways Sanctions Flyover at Khurda Road to Ease Traffic Congestion

Bhubaneswar: To address the increasing train traffic and congestion at Khurda Road Station, the Ministry of Railways has sanctioned a significant infrastructure project. The East Coast Railway (ECoR) had earlier proposed the construction of a Flyover Bridge to facilitate smoother train operations on the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line. This project, to be executed under the Energy Corridor Scheme of Indian Railways, aims to enhance the efficiency and capacity of train movements in this busy section.

The flyover, estimated to cost ₹191.87 crores, is designed to provide a dedicated infrastructure for trains traveling from Puri to connect to the down line towards Bhubaneswar without crossing other lines at Khurda Road Station.

Key Highlights of the Project:

  • Project Cost: The flyover will be constructed at a sanctioned cost of ₹191.87 crores.
  • Length: The Flyover Bridge will span 7.41 km.
  • Hassle-Free Movement for Passenger Trains: This will facilitate smooth movement of passenger trains in the Bhubaneswar direction originating from Puri.
  • Energy Corridor Scheme: The construction will be part of the Energy Corridor of Indian Railways, showcasing a commitment to sustainable and efficient infrastructure development.
  • Operational Efficiency: The new flyover will eliminate detentions due to cross-movements, improving the average speed and operational efficiency of trains on both the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line.
  • Congestion Relief: Main line trains will no longer be detained at Khurda Road Station, significantly reducing the waiting period for trains approaching this busy junction.

Khurda Road Railway Station is a major junction, handling various train movements. The construction of this flyover will facilitate simultaneous movements of trains in the Bhubaneswar-Brahmapur and Khurda Road-Puri rail sections. Previously, train movements had to be halted at Khurda Road to allow for cross-traffic from the Puri direction, leading to delays and operational inefficiencies.

Currently, any train coming from Puri and heading towards Bhubaneswar creates a surface crossing at Khurda Road Junction Station. This limitation prevents the simultaneous movement of trains from Khurda towards Palasa and from Puri towards Bhubaneswar. Once this flyover is commissioned, simultaneous movement of trains from Puri and towards the south can occur together. As a result, passengers from Puri and the south towards Bhubaneswar, and from the Bhubaneswar direction towards the south, will not experience delays due to the passing of trains from triangular directions.

Bureau The News Hashtag

Recent Posts

Two MEMU Services to Short Terminate, Originate at Mancheswar Amid Cuttack Station Redevelopment

Bhubaneswar: Two MEMU train services between Gunupur and Cuttack will undergo temporary changes as the…

5 hours ago

Viksit Bharat Youth Leadership Dialogue-2027 Launched in Odisha

Bhubaneswar: Odisha has launched the state-level campaign for the Viksit Bharat Youth Leadership Dialogue (VBYLD)-2027,…

5 hours ago

Dr Brundha D Takes Charge as SSEPD Commissioner-cum-Secretary

Bhubaneswar: Senior IAS officer Dr Brundha D on Wednesday assumed charge as Commissioner-cum-Secretary of the…

5 hours ago

Odisha Dy CM Orders Power Infrastructure Overhaul in Niali

Bhubaneswar: Odisha Deputy Chief Minister and Energy Minister Kanak Vardhan Singh Deo has directed Tata…

6 hours ago

Odisha, UAE Explore Trade, Export and Skilled Workforce Opportunities

Abu Dhabi/Bhubaneswar: Odisha is exploring greater trade and business opportunities with the UAE, with a…

6 hours ago

Odisha, IRRI Join Hands to Expand Kalajeera Rice Cultivation and Build Global Market

Bhubaneswar: Odisha is looking to take its indigenous specialty rice varieties, particularly Kalajeera rice, to…

6 hours ago