Odisha

Ministry of Railways Sanctions Flyover at Khurda Road to Ease Traffic Congestion

Bhubaneswar: To address the increasing train traffic and congestion at Khurda Road Station, the Ministry of Railways has sanctioned a significant infrastructure project. The East Coast Railway (ECoR) had earlier proposed the construction of a Flyover Bridge to facilitate smoother train operations on the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line. This project, to be executed under the Energy Corridor Scheme of Indian Railways, aims to enhance the efficiency and capacity of train movements in this busy section.

The flyover, estimated to cost ₹191.87 crores, is designed to provide a dedicated infrastructure for trains traveling from Puri to connect to the down line towards Bhubaneswar without crossing other lines at Khurda Road Station.

Key Highlights of the Project:

  • Project Cost: The flyover will be constructed at a sanctioned cost of ₹191.87 crores.
  • Length: The Flyover Bridge will span 7.41 km.
  • Hassle-Free Movement for Passenger Trains: This will facilitate smooth movement of passenger trains in the Bhubaneswar direction originating from Puri.
  • Energy Corridor Scheme: The construction will be part of the Energy Corridor of Indian Railways, showcasing a commitment to sustainable and efficient infrastructure development.
  • Operational Efficiency: The new flyover will eliminate detentions due to cross-movements, improving the average speed and operational efficiency of trains on both the Howrah-Chennai Main Line and the Khurda Road-Puri Branch Line.
  • Congestion Relief: Main line trains will no longer be detained at Khurda Road Station, significantly reducing the waiting period for trains approaching this busy junction.

Khurda Road Railway Station is a major junction, handling various train movements. The construction of this flyover will facilitate simultaneous movements of trains in the Bhubaneswar-Brahmapur and Khurda Road-Puri rail sections. Previously, train movements had to be halted at Khurda Road to allow for cross-traffic from the Puri direction, leading to delays and operational inefficiencies.

Currently, any train coming from Puri and heading towards Bhubaneswar creates a surface crossing at Khurda Road Junction Station. This limitation prevents the simultaneous movement of trains from Khurda towards Palasa and from Puri towards Bhubaneswar. Once this flyover is commissioned, simultaneous movement of trains from Puri and towards the south can occur together. As a result, passengers from Puri and the south towards Bhubaneswar, and from the Bhubaneswar direction towards the south, will not experience delays due to the passing of trains from triangular directions.

Bureau The News Hashtag

Recent Posts

OAVS students shine in CBSE Class XII results

Bhubaneswar: The Odisha Adarsha Vidyalaya Sangathan (OAVS) recorded an improved performance in the CBSE Class…

6 hours ago

Odisha asks departments to speed up project execution, reviews revenue and expenditure status

Bhubaneswar: Odisha Chief Secretary Anu Garg on Thursday reviewed the state’s revenue collection and departmental…

6 hours ago

Odisha to gradually convert all OSRTC buses into electric vehicles: Minister

Bhubaneswar: Odisha Transport Minister Bibhuti Bhusan Jena on Thursday announced that all buses operated by…

6 hours ago

Railways approves new tri-weekly express train between Puri and Koraput

Bhubaneswar: In a significant step towards improving rail connectivity in Odisha, the Ministry of Railways…

1 day ago

Centre launches ₹189 crore Mizoram Ginger Mission to boost farmer income and exports

New Delhi: In a major push to strengthen agriculture-based livelihoods and promote value-added exports from…

1 day ago

Utkalika marks 68 years of promoting Odisha’s handicraft heritage

Bhubaneswar: Odisha State Cooperative Handicrafts Corporation Ltd. (Utkalika) on Tuesday celebrated its 68th Foundation Day…

1 day ago