News

Centre Amends Electricity Rules to Empower Consumers

New Delhi: In a significant move towards enhancing consumer rights and promoting sustainable energy, the Government of India has approved amendments to the Electricity (Rights of Consumers) Rules, 2020. Union Minister for Power and New & Renewable Energy, RK Singh, announced the amendments, emphasizing their role in reducing timelines for new electricity connections and simplifying the installation process for rooftop solar systems.

The key amendments aim to facilitate the faster and more straightforward installation of Rooftop Solar PV systems for prosumers. Notably, the requirements for technical feasibility studies have been exempted for systems up to 10 kW capacity, with a reduced timeline of fifteen days for systems exceeding 10 kW. Distribution companies are now mandated to bear the cost of strengthening the distribution system for rooftop solar PV systems up to 5 kW. Additionally, the timeline for distribution licensees to commission Rooftop Solar PV systems has been halved from thirty days to fifteen days.

Consumers looking to charge their Electric Vehicles (EVs) can now obtain separate electricity connections, aligning with India’s commitment to reducing carbon emissions and achieving Net Zero by 2070.

The amendments also address the efficiency of obtaining new electricity connections, reducing the time period from seven days to three days in metropolitan areas, seven days to fifteen days in other municipal areas, and fifteen days to thirty days in rural areas. However, rural areas with hilly terrain will maintain a thirty-day timeline for new connections or modifications to existing connections.

Further enhancing consumer choice and transparency, the Rules introduce provisions for owners in residential colonies and flats to choose between individual connections for everyone or a single-point connection for the entire premises. The choice will be determined through a transparent ballot conducted by the Distribution Company. Tariff parity has been established for consumers availing of either connection type.

To address consumer complaints about meter readings, the amendments mandate the distribution licensee to install an additional meter within five days of receiving the complaint. This additional meter will verify consumption for a minimum period of three months, ensuring billing accuracy and consumer reassurance.

RK Singh reiterated the government’s commitment to consumer interests, highlighting the issuance of the Electricity (Rights of Consumers) Rules, 2020, on December 31, 2020. These rules set service standards for electricity distribution companies across India, covering aspects such as billing, complaints, compensation, and timelines for new connections. The recent amendments aim to further empower consumers in their interactions with electricity providers.

Bureau The News Hashtag

Recent Posts

Odisha Cabinet Clears Proposal to Restore Original English Spellings of 64 Places

Bhubaneswar: Seeking to align official place names with Odisha’s linguistic traditions and historical identity, the…

13 hours ago

Odisha CM Announces Free Education from KG to PG

Bhubaneswar: Odisha Chief Minister Mohan Charan Majhi on Friday announced that the state government will…

14 hours ago

CM Majhi Unveils New Road Corridor, Launches Flyover and Public Infrastructure Projects in Bhubaneswar

Bhubaneswar: In a push to strengthen urban mobility and support Bhubaneswar’s expanding infrastructure needs, Chief…

14 hours ago

Odisha Launches ‘Shishu Shram Nirakaran Rath’ to Raise Awareness and Eliminate Child Labour

Bhubaneswar: With a renewed focus on child rights and protection, the Odisha government on Thursday…

14 hours ago

Odisha Eases Registration Process for Apartments in Pre-RERA Projects

Bhubaneswar: In a major policy intervention aimed at resolving long-pending property registration issues, the Odisha…

14 hours ago

Free Bus Travel Announced for NEET-UG Re-Exam Candidates in Odisha

Bhubaneswar: Students appearing for the NEET-UG Re-Examination 2026 in Odisha will be able to travel…

1 day ago