News

Union Minister Nitin Gadkari Inspects Key Infrastructural Projects for Enhanced Connectivity

Faridabad: Union Minister for Road Transport and Highways, Nitin Gadkari, recently conducted an on-site inspection of the Faridabad Bypass Site and the construction progress of Package 1 & 2 of DND Sohna Highway on National Highway-148 NA, which includes the spur of the Delhi Mumbai Expressway. This ambitious infrastructure project, executed under the Bharatmala Pariyojana on the Hybrid Annuity Mode, spans 33 km and incurs a cost of Rs 3565 Crore.

The project strategically integrates major highways, creating a seamless network that includes the Direct Noida Delhi flyways, Delhi-Meerut Expressway, Kundli-Manesar-Palwal (KMP) Expressway, NH-2 (Delhi-Agra), Delhi Mumbai Expressway, and the Jewar airport connectivity highway.

The urban project features a 6-lane access-controlled highway with 3-lane service roads on both sides in the brownfield stretch. Notable infrastructural elements include 8 elevated sections (total length 12.034 km), 10 flyovers, 6 Vehicular Underpasses (VUPs), 11 Light Vehicle Underpasses (LVUPs), 13 Minor Bridges, 1 Road Over Bridge (ROB), 1 Rail Under Bridge (RUB), 6 Bus Bays, and 102 box culverts.

One of the innovative aspects of the project involves spanning over the Metro Line at four locations, reaching a maximum height of about 27 m. The infrastructure incorporates vertical gardening on piers, providing aesthetic, physiological, economical, and environmental benefits. To address noise pollution concerns, a noise barrier has been implemented along elevated sections.

The project also contributes to environmental sustainability by utilizing 10 hectares of barren land, formerly used for fly ash dumping, for a jungle safari project initiated by the Delhi government. This multi-faceted initiative not only enhances connectivity but also prioritizes eco-friendly and aesthetically pleasing elements, reflecting the government’s commitment to holistic infrastructure development.

Bureau The News Hashtag

Recent Posts

Four More Passenger Train Services Cancelled Due to Cyclonic Storm “Arnab”

Bhubaneswar: In view of the approaching cyclonic storm “Arnab”, four passenger train services have been…

3 days ago

Cyclone Arnab: 10,200 People Evacuated in Gajapati, Nearly 200 Shelters Ready

Gajapati: The Gajapati district administration has evacuated 10,200 people from 147 cyclone-vulnerable areas and stepped…

3 days ago

Cyclone Arnab: Schools, Colleges and Anganwadi Centres Closed in Kendrapara, Kandhamal

Bhubaneswar: All schools, colleges and Anganwadi centres in Kendrapara and Kandhamal districts will remain closed…

3 days ago

22 Train Services Cancelled due to Cyclonic Storm Arnab

Bhubaneswar: In view of the anticipated cyclonic conditions due to Cyclonic Storm ‘Arnab’, 22 express…

3 days ago

Pravati Parida Reviews Cyclone Arnab Preparedness in Rayagada

Rayagada: Odisha Deputy Chief Minister Pravati Parida on Wednesday reviewed the preparedness of Rayagada district…

3 days ago

Odisha Steps Up Cyclone Arnab Preparations; ₹19 Crore Released for Eight Districts

Bhubaneswar: With Cyclone Arnab posing a threat to parts of Odisha, the state government has…

3 days ago