Odisha

ECoR Takes Proactive Measures for Passenger Safety Ahead of Cyclone Dana

Bhubaneswar: In light of the looming threat posed by Cyclone DANA, East Coast Railway (ECoR) has initiated extensive safety protocols and operational preparations to ensure the protection of passengers and the smooth running of its services. Drawing on its experience with past cyclones, ECoR is making every effort to mitigate the potential impact of the storm on railway infrastructure and operations.

ECoR has established a 24/7 Disaster Management Cell at its headquarters in Rail Sadan and divisional offices in Khurda Road, Visakhapatnam, and Sambalpur to oversee emergency response and the restoration of train services in the aftermath of the cyclone. These teams are equipped to handle any disruptions and swiftly resume normal operations.

ECoR General Manager Shri Parmeshwar Funkwal chaired a critical preparatory meeting, urging all principal department heads and divisional managers to take immediate steps to ensure zero risk to passengers. Specialized teams have been deployed to focus on the rapid restoration of tracks, signaling systems, and electrification in the event of any damage. Diesel locomotives will also be on standby in case of power outages.

Key Safety Measures

To further prioritize passenger safety, ECoR has implemented a series of measures:

  • Emergency Control Rooms equipped with satellite phones are fully operational, ensuring consistent communication throughout the crisis.
  • With a red alert for coastal areas, a close watch is being kept on stations between Bhubaneswar and Visakhapatnam.
  • Patrolling of vulnerable railway tracks by specially deputed patrolmen and stationary watchmen will be ongoing during heavy rain.

Service Adjustments

As a precaution, ECoR has announced the cancellation of certain train services. Passengers are encouraged to monitor official updates to stay informed of changes.

Additional Precautions Include:

  • Vigilant monitoring of railway bridges, tracks, and signaling systems to prevent damage from heavy rains.
  • Removal of silt, vegetation, and other obstructions from catchwater drains.
  • Stockpiling of essential monsoon/cyclone reserve materials like boulders and sand for immediate use in case of flooding.
  • Close coordination with the Meteorological Department and government agencies for real-time updates.

Gangmen and patrol teams will be actively monitoring tracks during periods of heavy rainfall, ensuring their safety for train passage. Diesel locomotives, tower wagons, and heavy machinery have been strategically placed for emergency mobilization to restore services swiftly.

ECoR’s Control Office, operating around the clock, is in close coordination with the Meteorological Department and the Disaster Management Cell, ensuring constant vigilance and up-to-date information as Cyclone Dana approaches.

Bureau The News Hashtag

Recent Posts

Majhi Inaugurates 1,608 Houses, Launches BANDHU Scheme in Bhubaneswar

Bhubaneswar: Chief Minister Mohan Charan Majhi on Sunday inaugurated two affordable housing projects in Bhubaneswar,…

2 minutes ago

Odisha Receives ‘Leadership in Wind Energy De-risking’ Award at Windergy India 2026

Bhubaneswar: Odisha has received the prestigious ‘Wind India 2026: Leadership in Wind Energy De-risking’ award…

42 minutes ago

CM Majhi Orders Fast-Track Execution of Puri’s Key Development Projects

Bhubaneswar: From a proposed international airport to the restoration of historic religious sites, Odisha Chief…

1 day ago

Seva Sankalpa Abhiyan Engages Over 10 Lakh Students Across Odisha

Bhubaneswar, October 12: Students across Odisha have showcased their ideas for a developed India through…

1 day ago

Over 170 Students Join Skill Development Programme in Bhubaneswar

Bhubaneswar: More than 170 students and vocational lecturers from Government Vocational Higher Secondary Schools across…

2 days ago

East Coast Railway to Double Drone Fleet to 22 by March 2027

Bhubaneswar: East Coast Railway (ECoR) is expanding its technology-driven security network, with plans to increase…

2 days ago