Categories: News

DRDO Successfully Completes Six Developmental Trials of High-Speed Expendable Aerial Target ‘ABHYAS’

Chandipur: The Defence Research and Development Organisation (DRDO) has achieved a significant milestone by successfully completing six consecutive developmental trials of the High-Speed Expendable Aerial Target (HEAT) ‘ABHYAS’ with an improved booster configuration. These trials were conducted at the Integrated Test Range (ITR) in Chandipur, Odisha, marking a total of 10 successful developmental trials, thereby demonstrating the system’s reliability.

The latest trials featured enhancements in Radar Cross Section, Visual, and Infrared augmentation systems. During the trials, various mission objectives, including the safe release of the booster, launcher clearance, and endurance performance, were successfully validated. Notably, two launches were conducted back-to-back within a 30-minute interval, showcasing the system’s operational efficiency and minimal logistical requirements. Representatives from the Services were present to witness the flight trials.

ABHYAS, designed by DRDO’s Aeronautical Development Establishment in Bengaluru and developed in collaboration with Hindustan Aeronautics Limited (HAL) and Larsen & Toubro, offers a realistic threat scenario for weapon systems practice. This indigenous system is equipped for autonomous flying with an auto pilot and features a laptop-based Ground Control System for aircraft integration, pre-flight checks, and autonomous flight. It also includes capabilities for recording data during flight for post-flight analysis. The booster for ABHYAS has been designed by the Advanced Systems Laboratory, and the navigation system by the Research Centre Imarat. With identified production agencies, ABHYAS is now ready for mass production.

Raksha Mantri Rajnath Singh lauded DRDO, the Armed Forces, and the Industry for the successful developmental trials of ‘ABHYAS’. He highlighted that these successful tests are a noteworthy testament to the synergy between scientists and the industry.

Bureau The News Hashtag

Recent Posts

Odisha Targets Completion of All Mega Rural Water Supply Projects by March 2027

Bhubaneswar: The Odisha government has set a March 2027 deadline for the completion of all…

4 hours ago

West Bengal Renames Digha Jagannath Temple, Removes ‘Dham’ from Official Title

Bhubaneswar: The West Bengal government on Tuesday announced that the word “Dham” will no longer…

4 hours ago

BDA Cuts Official Vehicle Usage Limit to Reduce Fuel Consumption

Bhubaneswar: In line with the Odisha government's efforts to curb fuel consumption and promote prudent…

5 hours ago

Odisha Cabinet Gives Nod to 10 Development Proposals Across Key Sectors

Bhubaneswar: The Odisha Cabinet on Monday approved a series of proposals aimed at boosting infrastructure…

1 day ago

Cabinet Approves ₹100.89-Crore Wastewater Treatment Project to Rejuvenate River Daya

Bhubaneswar: Taking a major step towards tackling water pollution in the state capital, the Odisha…

1 day ago

Odisha Cabinet Approves ₹112-Crore 24×7 Water Supply Project for BDA Town Planning Areas

Bhubaneswar: Residents of the rapidly developing Town Planning Scheme areas under the Bhubaneswar Development Authority…

1 day ago